78 records in the Standard Lens

Regulation & government · Texas

Texas oil and gas waste disposal rules and permit information

Primary source for disposal permitting and Rule 9.

Railroad Commission of Texas · Reference

Science, research & data · Texas

Texas seismicity review for injection and disposal permits

The agency describes when and how a seismicity review is triggered.

Railroad Commission of Texas · Reference

People, institutions & events · Global

Produced Water Society event calendar

Conference and community calendar.

Produced Water Society · Reference

People, institutions & events · United States

Oilfield Water Connection event calendar

Maintained listing for upcoming and past oilfield-water business conferences.

Oilfield Water Connection · Reference

Markets & finance · United States

Oilfield Water Weekly digest archive

A discovery feed for water-market developments; verify and link to the underlying original report for PWI coverage.

Oilfield Water Connection · Reference

Treatment, technology & reuse · United States

DOE produced water research project selections

Project descriptions cover characterization, treatment and resource recovery.

U.S. Department of Energy · Reference

Companies & transactions · United Arab Emirates / Abu Dhabi / Haliba

Al Dhafra awards AED 1 billion Haliba produced water treatment contract

Al Dhafra Petroleum signed an AED 1 billion design-build-operate agreement with Excel ASTRA Engineering & Construction for new produced water treatment facilities at the Haliba field. ADNOC says the facilities will support Haliba’s next growth phase and a 50,000-barrel-per-day oil-production target; the public record does not disclose treatment capacity, process design, schedule or water disposition.

ADNOC · 2026-11-06

Markets & finance · Permian Basin / United States

Mercer Capital links Permian disposal constraints to network value and reuse investment

Mercer Capital’s November 6 post-conference analysis says disposal constraints and rising produced water volumes are increasing the importance of connected pipeline systems, backup outlets, durable service commitments and remaining disposal life. It treats beneficial reuse, data-center and power demand, and mineral recovery as potential commercial outlets that still require reliable treatment, committed customers, suitable infrastructure and workable economics. The valuation multiples discussed are the author’s conference-based analysis, not PWI valuations or verified transaction terms.

Mercer Capital · 2026-11-06

Markets & finance · Permian Basin / Delaware Basin

NGL reports record produced water disposal of 3.45 million barrels per day

NGL Energy Partners reported record physical disposal of approximately 3.45 million barrels of produced water per day in its fiscal second quarter, up 22.9% from a year earlier. Water Solutions adjusted EBITDA increased to $178.3 million from $151.9 million. The company says its LEX II extension remains expected in service by the end of calendar 2026 and would expand the long-haul system to 81 miles with capability to move about 560,000 barrels per day from Eddy and Lea counties in New Mexico to Andrews County, Texas.

NGL Energy Partners Water Solutions · 2026-11-05

Companies & transactions · Permian Basin / Delaware Basin

LandBridge adds 25,000 Delaware Basin acres and outlines produced water disposal upside

LandBridge says it completed about 25,000 acres of acquisitions across its Delaware Basin footprint during the third quarter. The company identifies undeveloped pore space outside over-pressured injection zones near the Stateline region as a potential long-term produced water disposal alternative and says operator discussions are active. The release also reports higher surface-use revenue partly driven by produced water handling volumes, but does not disclose permitted disposal capacity, customer commitments or an in-service date for the new pore-space opportunity.

LandBridge · 2026-11-04

Markets & finance · Permian Basin / Texas

TPL reports produced water royalty volumes at 5.5 million barrels per day

Texas Pacific Land reports third-quarter produced water royalty volumes of 5.541 million barrels per day, up from 4.872 million barrels per day in the second quarter, and produced water royalty revenue of $41.4 million, up from $37.1 million. Water sales volumes also increased, while water sales revenue fell to $28.4 million from $39.7 million because average realized pricing declined. These are company-reported royalty and sales metrics, not a basin-wide water balance.

Texas Pacific Land · 2026-11-04

Operations & water management · Permian Basin / Delaware Basin

Western’s produced water throughput rises to 3.047 million barrels per day

Western Midstream reports third-quarter throughput of 3.047 million barrels per day for its Delaware Basin produced water assets, up 2% from 2.993 million barrels per day in the second quarter. The company’s attributable throughput was 2.992 million barrels per day. Reported per-barrel adjusted gross margin for produced water assets declined to $0.89 from $0.96 sequentially.

Western Midstream · 2026-11-04

Regulation & government · United States / Texas

TCEQ adopts land-application rules for treated produced water

Texas commissioners approved amendments to Chapters 309 and 210 that implement Senate Bill 1145 and establish the TCEQ framework for land application of produced water treated for beneficial use. The agency lists an approval date of November 4, 2026 and an effective date of November 26, 2026. The final rules clarify applicability and minimum requirements; adoption does not itself approve an individual land-application project.

Texas Commission on Environmental Quality · 2026-11-04

Operations & water management · Permian Basin / Delaware Basin

WaterBridge reports record handling volumes as Speedway Phase I beats forecast

WaterBridge reported record third-quarter produced water handling volumes of 2.8 million barrels per day, up 6% sequentially and 9% year over year. Revenue reached $240.2 million and adjusted EBITDA $124.2 million. The company says Speedway Phase I volumes exceeded expectations and new pipeline-access agreements supported higher 2026 volume and adjusted EBITDA guidance; discussions for Phase II remain commercial work rather than a completed expansion.

WaterBridge · 2026-11-04

Companies & transactions · Permian Basin / New Mexico

Direct Midstream signs conditional New Mexico well-operating agreement as Vivakor deal advances

Vivakor says acquisition target Direct Midstream signed a conditional agreement with Phoenix Energy Solutions to operate a portfolio described as 44 oil wells and eight saltwater disposal wells. Projected volumes of about 6,000 barrels per day of produced water and more than $2 million in annual service revenue depend on Phoenix completing its asset acquisition, permits, bonding, insurance and final fee arrangements. Vivakor’s proposed Direct Midstream acquisition still lacks a definitive agreement and is not complete.

Vivakor · 2026-11-04

People, institutions & events · Houston, TX

8th Annual Oilfield Water Industry Update

Houston conference on produced water data, midstream markets, infrastructure and treatment.

Oilfield Water Connection · 2026-11-03

Regulation & government · United States / Washington, D.C.

DOE schedules council vote on final national produced water report

A November 3 Department of Energy notice says the National Petroleum Council will meet December 7 to present, discuss and consider approval of the final report of its Produced Water Committee. The public meeting will run from 9:00 a.m. to noon Eastern in Washington, D.C., with a livestream. About 15 minutes are reserved for public comments, and requests to listen or speak are due at least seven days beforehand. The notice does not contain the report or indicate that its recommendations have already been approved.

U.S. Department of Energy · 2026-11-03

Companies & transactions · Permian Basin / Delaware Basin

Select closes $700 million Pilot Water acquisition

Select Water Solutions says it closed the Pilot Water Solutions acquisition on November 2 for aggregate consideration of approximately $700 million: about $600 million in cash, subject to customary post-closing adjustments, and 5,149,331 Select Class A shares. One seller may receive an additional $15 million if specified operating milestones are met. Select says Pilot’s primary operations are in the Delaware Basin and plans to integrate the acquired water midstream platform with its recycling and disposal businesses. A new $500 million revolving credit facility became effective at closing.

Select Water Solutions · 2026-11-02

Science, research & data · Permian Basin / San Juan Basin

Study screens which fracturing additives matter most for produced water monitoring

A peer-reviewed npj Clean Water study combines 2020–2025 FracFocus disclosures, chemical-property information and published produced water evidence across 33,177 hydraulic-fracturing events. Its screening framework ranks biocides, solvents and surfactants as the leading composite-relevance categories in the Permian, and acids, biocides and solvents in the San Juan. The authors find that mature produced water salinity, major ions, metals, radionuclides and much of the ammonia burden are predominantly controlled by formation and process conditions, while additive-related influences are more relevant during the flowback-to-produced water transition and for mobile organics, toxicity-related constituents, fouling, scaling and treatment effects. The framework is intended for screening and prioritization, not source attribution, site-specific concentration estimates or exposure prediction.

npj Clean Water · 2026-11-02

Treatment, technology & reuse · Permian Basin / Texas

TETRA reports seven-project Oasis pipeline as six reuse permits remain pending

In its third-quarter results, TETRA Technologies says its Oasis produced water desalination pipeline includes seven prospective projects, four tied to data centers or their power requirements. The company says six beneficial-reuse applications are pending before the Texas Commission on Environmental Quality; its customers are the permittees, and TETRA is responding to TCEQ and EPA questions with water-quality test results. The disclosure describes a commercial pipeline and pending applications, not approved permits or operating projects.

TETRA Technologies · 2026-11-02

Science, research & data · Global

AAPG maps produced water management trends across six regions

AAPG’s Division of Environmental Geosciences surveys produced water management across North America, South America, the Middle East, Africa, Europe and Asia-Pacific. The overview contrasts disposal, treatment, reuse and mineral-recovery approaches and supplies a useful global comparison. Its Texas rulemaking timeline is less current than TCEQ’s November 4 agenda, so the article is retained as a regional snapshot rather than a current regulatory-status source.

American Association of Petroleum Geologists · 2026-11-01

Regulation & government · United States / New Mexico

Trihydro maps four proposed New Mexico produced water permit classes

Trihydro’s technical analysis describes four permit classes in a petition to amend New Mexico’s produced water rules: non-discharging uses, groundwater discharges, surface-water discharges and downstream users. It highlights proposed water characterization, toxicity testing, monitoring, financial assurance and a staged initial surface-water authorization of up to 25,000 barrels per day, while cautioning that the petition remains an early planning signal rather than a final compliance standard.

Trihydro · 2026-11-01

Stakeholders & communities · Permian Basin / Iraan and Pecos River, Texas

Iraan forum draws nearly 100 people to produced water reuse discussion

Permian Basin Oil & Gas Magazine reports that nearly 100 people attended the October 2 Iraan town hall hosted by Friends of the Pecos River and the Texas Produced Water Consortium. The meeting gave landowners information on treatment, reuse and risk while TCEQ reviews multiple treated-produced water discharge applications in the Pecos watershed. The report is a distinct post-event account rather than a relabeling of the September event preview.

Permian Basin Oil & Gas Magazine · 2026-10-30

Treatment, technology & reuse · Argentina / Neuquén / Vaca Muerta

Hidrofrac presents Vaca Muerta produced water transfer and reuse work with TotalEnergies

Energía 360 reports that Hidrofrac presented a modular flowback-treatment system and a 2025 produced water transfer project with TotalEnergies at Aguada Pichana Este. The company says the work was intended to expand reuse in unconventional well completions and reduce fresh-water demand and disposal, but neither the article nor the public company material provides treated volumes, reuse percentages or measured reductions, so operating performance cannot be quantified from the available record.

Energía 360 · 2026-10-30

Regulation & government · Texas / Permian Basin / Lubbock

Texas officials press agricultural and industrial reuse of treated produced water

KCBD reports that state Sen. Charles Perry and Railroad Commissioner Wayne Christian are advocating wider agricultural and industrial reuse of treated produced water, including for data-center cooling, while calling for a more consistent permitting path. Perry cites roughly 26 million barrels per day of Permian produced water and says crop testing has not shown soil accumulation to date, but the article does not link the underlying datasets or establish commercial-scale safety, approvals or deployment.

KCBD NewsChannel 11 · 2026-10-29

Stakeholders & communities · Permian Basin / Carlsbad and Eddy County, New Mexico

Carlsbad approves Mewbourne produced water line through wellhead protection zone

Adrian Hedden reports that the Carlsbad City Council approved Mewbourne Oil’s produced water pipeline in a 6–1 vote after a Water and Sewer Board recommendation. The roughly four-mile line would run about 0.6 mile inside city limits and about 1.2 miles through the municipal Wellhead Protection Zone before carrying produced water to a disposal site. Approval conditions include construction coordination with the city and submission of final coordinates; one councilor opposed the project over cumulative water- and air-quality concerns.

Carlsbad Current-Argus · 2026-10-27

Regulation & government · California / Kern County / Fruitvale Oil Field

California court rejects CEQA exemptions for 12 proposed produced water injection wells

Arthur F. Coon’s analysis of the published Fifth District opinion says San Joaquin Facilities Management’s proposal for up to 12 new Fruitvale Oil Field injection wells is not exempt from CEQA as an ongoing pre-1973 project or as an existing-facility or minor-land-alteration project. The ruling requires environmental review; it does not decide whether CalGEM must ultimately approve or reject the wells.

CEQA Developments · 2026-10-26

Treatment, technology & reuse · Permian Basin / Reeves County, Texas

Western’s Permian pilot passes 100,000 barrels of reclaimed water

Midland Reporter-Telegram reports that Western Midstream’s JIP 2 demonstration facility near Red Bluff Reservoir has produced more than 100,000 barrels of reclaimed freshwater. The 2,000-barrel-per-day feed design targets about 1,000 barrels per day of reclaimed water; most output is irrigating seven acres in a two-year crop study while researchers evaluate toxicity and other long-term effects. The milestone is measured pilot output, not proof that agricultural, industrial-cooling or surface-discharge use is commercially approved at basin scale.

Midland Reporter-Telegram · 2026-10-24

Companies & transactions · Permian Basin / Midland, Texas

Vivakor completes due diligence on proposed $40 million Direct Midstream acquisition

Vivakor says it completed due diligence on Direct Midstream and is working toward a definitive purchase agreement under the previously announced $40 million framework. Direct’s platform is described as 17 saltwater-disposal facilities, nine fresh-water and brine stations and about 11.5 million barrels per month of permitted disposal capacity. Final terms, funding and closing conditions remain unresolved, and the acquisition has not been completed.

Vivakor · 2026-10-23

Operations & water management · Permian Basin / New Mexico and Texas

Select describes the infrastructure and chemistry behind Permian produced water reuse

In a company-hosted Water Exchange discussion, Select executives describe how connected storage, treatment and pipeline capacity lets the company aggregate produced water across operators for reuse in large fracturing programs. They distinguish bacteria and solids control for frac reuse from the more costly salt removal needed for beneficial reuse, and discuss mineral recovery, data-center cooling and pending discharge permits.

Select Water Solutions · 2026-10-22

Markets & finance · Permian Basin / United States

ADI study preview models Permian disposal capacity tightening within 2.5 years

ADI Analytics’ public preview of a commercial multi-client study says its basin model puts Permian produced water at 24.9 million barrels per day in 2025 and projects in-basin disposal capacity could max out within 2.5 years. The preview outlines analysis of water balances, regulation, treatment costs and potential buyers; the underlying model and full study were not available for independent reproduction.

ADI Analytics · 2026-10-22

Science, research & data · China / Shengli, Northwest and Xinjiang oilfields

Dual-frequency analyzer improves water-cut measurement in heavy-oil field tests

A new study describes a dual-channel analyzer that settles a produced-fluid sample before measuring electrical properties at two frequencies. The cited laboratory program reported 0.47% mean absolute error, while independent validation across eight heavy-oil wells and 62 paired samples reported 1.68%.

Bioengineer.org · 2026-10-21

Regulation & government · Argentina / Neuquén / Vaca Muerta

Neuquén begins evaluating 11 Vaca Muerta produced water reuse proposals

Neuquén says 11 operators formally submitted one productive-development proposal and one separate produced water reuse proposal each. The reuse plans aim to replace at least 10% of freshwater in each fracture with treated produced water and now enter provincial technical review; the province also reports one operator has field-validated 7,990 cubic meters of reuse per well.

Neuquén Informa — Provincial Press Secretariat · 2026-10-21

People, institutions & events · Appalachia

5th Annual Marcellus Shale Water Business Update

Pittsburgh conference on the Appalachian produced water business and operating outlook.

Oilfield Water Connection · 2026-10-20

Stakeholders & communities · Permian Basin / Midland, Texas

Midland Youth Coalition hears produced water framed as risk, cost and opportunity

Chris Tribbey reports on Jonna Smoot’s “Produced Water 101” presentation to the Midland Youth Coalition. The article brings produced water safety, treatment, infrastructure costs and reuse into a community setting; volume and spending figures are attributed to the presenter and cited Bluefield Research, not independently validated by PWI.

Midland Reporter-Telegram · 2026-10-20

Treatment, technology & reuse · Texas / United States

Caprock licenses Texas Tech-linked technology for produced water lithium recovery

Caprock DLE has licensed Texas Tech-linked lithium extraction technology for oil and gas applications and is building its first modular unit, with field operations planned for spring 2027.

Caprock Direct Lithium Extraction · 2026-10-19

Science, research & data · Oman / Rima

Oman wetland study compares produced water biofilms on wood, plastic and marble

Sultan Qaboos University's October 19 research account describes 30-day biofilm growth on plywood, polypropylene and marble in a constructed wetland treating produced water. Plywood supported greater bacterial abundance, and microbial analysis suggested hydrocarbon-degrading potential. This did not establish improved contaminant-removal rates or treated-water quality. The university's original abstract and bibliographic record were checked; the underlying Environmental Advances article is dated October 2026, with October 1 given in release metadata. Direct journal full text was unavailable. Veolia Oman funded the work.

BrightSurf · 2026-10-19

Operations & water management · Argentina / Vaca Muerta / Golfo San Jorge

Vaca Muerta interviews put reuse standards and disposal logistics at center of water debate

David Mottura’s original ADNSUR reporting from the October 15–16 PWS meeting includes interviews with Guillermo Aversano and logistics consultant Roberto Lino Blanco. They argue that treatment must match the intended use, with fracturing reuse first and other applications requiring further testing, and that recycling could reduce truck-dependent disposal costs. The report connects Vaca Muerta’s emerging water challenge with mature-field expertise in Golfo San Jorge and discusses proposed use of vented gas to power treatment. These are attributed operating perspectives and proposals, not verified project performance, approved irrigation or drinking-water suitability.

ADNSUR · 2026-10-17

Treatment, technology & reuse · Permian Basin / Texas

Iofina commissions Permian iodine plant using Western Midstream produced water

Iofina says IO#12 has been commissioned and handed to operations, with brine flowing during hydrotesting; iodine production is expected to start and ramp up in coming weeks. Western Midstream is to supply up to 50,000 barrels per day of produced water, supporting a target of 170–220 metric tonnes of iodine annually. These are supply and output targets, not measured throughput or proven annual production. The same-day Q3 update reports 205.2 tonnes across the business, below expectations, and revises anticipated H2 production to 440–455 tonnes, dependent on brine supply and IO#12’s contribution.

Iofina · 2026-10-16

Regulation & government · Argentina / Neuquén / Vaca Muerta

Neuquén reports 16 projects as PWS conference advances Vaca Muerta water reuse agenda

Neuquén’s October 16 government report confirms the October 15–16 PWS conference and says operators submitted 16 productive-development projects under water-fee incentives. Speakers prioritize produced water and flowback reuse in fracturing, with other uses as later objectives. The proposed Red Azul network carries surface water, not treated produced water. Submissions, policy ambitions and conference statements are not approved treatment capacity or proven reuse outcomes.

Neuquén Informa — Provincial Press Secretariat · 2026-10-16

Regulation & government · Texas / Permian Basin

Texas commissioner urges fast-track rules for industrial produced water reuse

Railroad Commission of Texas Commissioner Wayne Christian urged lawmakers and regulators to create a faster, clearer pathway for industrial reuse of treated produced water, including data-center cooling. The October 15 release cites University of Texas at Austin and Texas Produced Water Consortium research. This is one commissioner’s policy position and a call for legislative or regulatory action, not a new rule or permit authorization; the cited research does not establish safety for every feedwater, treatment train or end use.

Railroad Commission of Texas · 2026-10-15

Stakeholders & communities · Williston Basin / McKenzie County, North Dakota

North Dakota reports 3,402-barrel produced water spill near Watford City

North Dakota Monitor, citing the state Department of Environmental Quality release and spill-program manager Bill Suess, reports that a Tallgrass Water pipeline released an estimated 3,402 barrels of produced water on October 14 about 10 miles southwest of Watford City. Some entered a dry tributary of Cherry Creek; the agency said the spill was contained, 1,200 barrels had been recovered by the report, cleanup was continuing and the cause remained unknown. The no-downstream-impact assessment is the regulator’s current view, not a final cleanup finding.

North Dakota Monitor · 2026-10-15

Regulation & government · Uinta Basin / Uintah County, Utah

EPA opens comment on proposed Utah Class II produced water disposal well

EPA Region 8 published a draft Underground Injection Control permit that would authorize Robert L. Bayless Producer LLC to construct and operate the Rock House 3-32-10-23 Class II well for produced water from nearby oil and gas operations on the Uintah and Ouray Indian Reservation. The proposed well is 7,465 feet deep, with injection in the Mesa Verde Formation at 6,429–7,242 feet. Comments and hearing requests are due November 16, 2026; the permit is proposed, not final.

U.S. Environmental Protection Agency · 2026-10-15

Markets & finance · Permian Basin / Delaware Basin

Select prices $900 million bond deal to fund Pilot Water acquisition

Select says its subsidiary priced $900 million of 7.625% senior notes due 2034 at par, upsized from $800 million, with closing expected October 21 subject to customary conditions. Proceeds are intended partly for the pending Pilot Water acquisition and partly to repay existing term and revolving debt. The bond offering is not contingent on the acquisition; if the deal is not completed by March 1, 2027 or is abandoned, the issuer must redeem the principal amount above $450 million under the stated terms.

Select Water Solutions · 2026-10-14

Science, research & data · Global / Riyadh, Saudi Arabia

WPC forum groups produced water mineralization, plasma treatment and zero-overboarding studies

WPC Energy’s October 14 technical forum assembled studies on hydrate-based desalination, carbon mineralization in oilfield brines, chemical-free plasma treatment, water-source identification, reinjection compatibility and a Qatar zero-overboarding case. The page is an organizer program containing author-submitted abstracts; the reported performance figures and claimed firsts were not independently validated for this edition.

WPC Energy · 2026-10-14

Treatment, technology & reuse · Northeast British Columbia / Canada

British Columbia storage project applies updated produced water guidance

Geosynthetics Magazine reports that Layfield and Concept Tanks announced a 25,000 m³ relocatable, double-lined storage system for an unnamed large natural-gas producer in northeast British Columbia. The project is expected to support produced water reuse and includes leak detection and bird-netting. The outlet attributes project details to Layfield; the customer is not identified and installation is prospective. BC Energy Regulator guidance independently confirms that its April 2026 update governs produced water and saline-fluid storage, transfer, monitoring and reporting.

Geosynthetics Magazine · 2026-10-12

Operations & water management · Williston Basin / North Dakota

North Dakota reports 594-barrel produced water release at XTO site

North Dakota's Oil and Gas Division says XTO Energy reported a 594-barrel produced water release at the Deep Creek Federal 44X-5A site in Dunn County on October 12. The operator reported recovering all 594 barrels from the location as of that date; a state inspector had visited and would monitor any additional cleanup. The notice does not identify the cause or state that the final cleanup is complete.

North Dakota Department of Mineral Resources · 2026-10-12

Treatment, technology & reuse · Permian Basin / United States

Tank-industry viewpoint maps storage needs for produced water cooling

In a TechRadar Pro Perspectives article, Balmoral Tanks sales director Jonathan Smith argues that produced water could support data-center cooling where source and facility are close, and says variable chemistry requires early specification of tank materials, segregation, temperature exposure and maintenance access. This is vendor-authored opinion, not evidence that a named project is operating or contracted; its Permian volume figures are attributed secondhand to B3 Insight.

TechRadar Pro · 2026-10-12

Stakeholders & communities · Permian Basin / Loving and Hobbs, New Mexico

Loving residents press for water stewardship and monitoring in New Mexico oil country

Jerry Redfern’s original reporting follows residents’ concerns about water use, historical wastewater handling and air monitoring around Loving and Hobbs. It is a separate October 12 installment from the Pecos River article already carried. Health experiences and a recalled historical discharge are attributed personal accounts, not new confirmed spill records or findings of medical causation; the proposed monitoring response is not presented as already operational.

Capital & Main · 2026-10-12

Regulation & government · Argentina / Neuquén / Vaca Muerta

Neuquén says operators submitted crop and water-reuse pilots after fee increase

EconoJournal reports that Neuquén environment secretary Hipólito Salvatori said operators submitted sustainable production projects and separate water-reuse pilots after Decree 792/26 tripled the industrial raw-water charge. The article says pilots are planned for December, with YPF, Vista, PAE and Shell assigned the largest areas for proposed irrigated crop projects, and that the province initially wants at least 10% flowback reuse. Project designs, treatment performance and agricultural suitability have not yet been independently demonstrated.

EconoJournal · 2026-10-11

Companies & transactions · Permian Basin / Midland, Texas

Vivakor sets $40 million framework for Direct Midstream proposal

Vivakor’s October 9 issuer release says a non-binding letter of intent now gives its proposed acquisition of Direct Midstream a $40 million gross purchase-price framework, including a contemplated $10 million investment and predominantly preferred-stock consideration. The price could adjust between $30 million and $50 million based on Direct’s actual 2027 free cash flow. Due diligence, financing, audited statements, a fairness opinion and a definitive agreement remain outstanding; the transaction is not completed.

Vivakor · 2026-10-09

Science, research & data · Global

SPE Journal opens sustainability call covering produced water management

The SPE Journal call opens October 15 and accepts submissions through April 15, 2028. Produced water management and lower water production are eligible only when paired with measurable sustainability or environmental performance; publication is subject to peer review.

Journal of Petroleum Technology · 2026-10-08

Science, research & data · Permian Basin / Texas

UT Austin models desalination trade-offs for produced water cooling at data centers

UT Austin’s October 8 research account compares membrane and thermal desalination for data center water supply. Its underlying Water Research paper was available online August 17; this is newly surfaced coverage, not a new October 17 study. Reverse osmosis is less energy intensive but limited at high salinity; thermal treatment handles saltier water with greater energy use and scaling challenges. The lowest-stress Longview scenario uses brackish groundwater, not produced water. These are modeled cases, not proof of an operating produced water cooling project, site-specific safety or permit approval. The accompanying university-hosted data center stock photo is illustrative.

UT Austin — Walker Department of Mechanical Engineering · 2026-10-08

Stakeholders & communities · Permian Basin / New Mexico / Pecos River

Pecos reporting traces produced water risks along New Mexico’s Permian corridor

Jerry Redfern’s field reporting follows produced water hauling, disposal and ecological concerns along the Pecos River in southeast New Mexico. The article reports 380 oil and gas wells and 11 injection wells within a half mile of the river. A suspected roadside wastewater dump described in the story was observational and not independently confirmed.

Capital & Main · 2026-10-07

Treatment, technology & reuse · Permian Basin / Midland, Texas

ORNL details commercial lithium recovery from Permian produced water

Oak Ridge National Laboratory says Element3’s Midland plant uses ORNL-licensed technology to recover lithium from Permian produced water and convert it to battery-grade lithium carbonate. ORNL reports nameplate capacity of 3,000 tons per year and commercial deployment; those capacity and “first in decades” claims are institutional descriptions, not PWI verification of sustained output.

Oak Ridge National Laboratory · 2026-10-07

Companies & transactions · Permian Basin / Midland Basin

Vivakor explores acquisition of Midland water midstream operator

Vivakor announced a non-binding indication of interest to acquire 100% of Direct Midstream, which it says operates 17 saltwater-disposal facilities, nine fresh-water and brine stations, and about 11.5 million barrels per month of permitted disposal capacity. No purchase price or definitive agreement was disclosed; completion is not assured.

Vivakor · 2026-10-06

Markets & finance · Permian Basin / Texas / New Mexico

B3 models different disposal constraints in the Delaware and Midland basins

B3 Insight's October 5 analysis distinguishes pressure-limited disposal in the Delaware from geographically concentrated capacity and connection needs in the Midland. Its InjectIQ outlook argues that completion-water reuse cannot absorb all future produced water and that reservoir pressure increasingly shapes capital allocation. These are a commercial data provider's proprietary forecasts and interpretation, not independently reproduced capacity measurements or new regulatory findings. The public article and webinar-summary landing page were reviewed; underlying model inputs and full forecast validation were not available.

B3 Insight · 2026-10-05

Companies & transactions · Appalachian Basin / Pennsylvania–Ohio–West Virginia

HydroEdge combines with RES Water across the Appalachian water cycle

HydroEdge says its WET Tech parent acquired RES Water and combined the businesses into an Appalachian water-management platform spanning hauling, pipelines, treatment, recycling and storage. The issuer reports five Pennsylvania facilities, roughly 700,000 barrels of storage and up to 116,000 barrels per day of processing capacity. Acquisition terms were not disclosed, and the operating and environmental benefits described are company expectations.

HydroEdge Solutions · 2026-10-02

Treatment, technology & reuse · Permian Basin / Jal, New Mexico

Permian field case uses produced water in sour-gas treatment

Merichem's Jeffrey Gomach describes a month-long trial near Jal using produced water as a treatment medium. This is a supplier-authored case study; results and operating limits are specific to the tested installation.

Journal of Petroleum Technology · 2026-10-01

Markets & finance · Permian Basin / Delaware Basin

LandBridge filing confirms $125 million additional debt placement

The company's October 1 Form 8-K records completion of 6.250% notes due 2030, with proceeds intended to repay revolving borrowings. Full filing text was read on StockTitan; direct SEC retrieval was unavailable.

StockTitan · 2026-10-01

Regulation & government · Permian Basin / Texas–New Mexico

Texas House border discussion turns to cross-state produced water disposal

Texas Scorecard reports that Rep. Brooks Landgraf used produced water flows and disposal pressure during a September 30 Texas House boundary hearing to argue for greater Texas–New Mexico regulatory coordination, including a possible interstate compact. The official House schedule confirms the hearing’s boundary-review purpose; the cross-border water-flow assertions are a lawmaker’s statements, not agency measurements or adopted policy.

Texas Scorecard · 2026-10-01

Regulation & government · Permian Basin / Texas / New Mexico

Federal oil-theft indictments involve a West Texas saltwater-disposal business

DOJ alleges an interstate stolen-crude scheme involving Vallee Oil & Gas. The release distinguishes authority to accept produced water from authority to purchase crude. Indictments are allegations; the defendants are presumed innocent.

U.S. Department of Justice — Western District of Texas · 2026-09-29

Regulation & government · Texas / Permian Basin

Commentary proposes a Texas tax on produced water disposal

T. Ray Guy argues for a Texas disposal tax, with a higher rate on water originating outside the state. This is a published policy argument, not proposed legislation, enacted law or PWI endorsement.

The Texas Lawbook · 2026-09-29

Stakeholders & communities · Permian Basin

Iraan forum to examine treated produced water and the Pecos River

The October 2 forum brings local residents and researchers into the reuse discussion.

Permian Basin Oil and Gas Magazine · 2026-09-25

Companies & transactions · Permian Basin

Select announces agreement to acquire Pilot Water Solutions

Select’s September 24 issuer release describes a $700 million cash-and-equity agreement, plus up to $15 million in contingent cash consideration. Closing is expected in the fourth quarter of 2026, subject to regulatory approval and customary conditions; the transaction has not been described as completed.

Select Water Solutions · 2026-09-24

Stakeholders & communities · Appalachia / Washington County, Ohio

Ohio wastewater-injection debate reaches the governor's race

Original reporting compares candidate positions and community concerns about wastewater migration, alongside industry opposition to a moratorium. The proposed pause is a campaign position, not an enacted statewide restriction.

Ohio Capital Journal · 2026-09-24

Regulation & government · Argentina / Neuquén / Vaca Muerta

Neuquén links water fees to industrial reuse in Vaca Muerta

The province describes a water-fee framework applied from July 1 and a policy prioritizing industrial recirculation and reuse. Its separate agricultural proposal uses raw river water drawn before industrial use; it does not propose irrigating those crops with flowback.

Neuquén Informa — Provincial Press Secretariat · 2026-09-16

Operations & water management · Permian Basin / Eddy and Lea counties, New Mexico

Goodnight advances Estacado produced water pipeline in northern Delaware Basin

Previously used local reporting is carried forward as operating context. Goodnight had begun construction of a 90-mile line planned to add 550,000 barrels/day of capacity. Planned takeaway capacity is not measured throughput or a verified in-service announcement.

Midland Reporter-Telegram · 2026-09-12

Science, research & data · North Sea / Norway

North Sea study finds produced water can misstate reservoir microbiomes

A peer-reviewed study compared paired reservoir-fluid and produced water samples from four North Sea fields and found that produced water alone can underrepresent reservoir-native anaerobic microbes relevant to souring and microbiologically influenced corrosion while overrepresenting water-associated taxa. The authors recommend reservoir-fluid sampling where practicable and explicit caveats when produced water is used as a proxy. Limitations include one sampling time point, unsequenced external water sources and insufficient reservoir-fluid DNA from one field for metagenomics.

Metabarcoding and Metagenomics · 2026-09-10

Science, research & data · Denmark / North Sea

DTU research examines why oil droplets resist separation in produced water

Researchers tested five offshore-water samples using pure toluene droplets and microfluidics. Surface-active constituents strongly reduced coalescence; the method complements chemical analysis and does not establish full-scale field treatment performance.

DTU Offshore — Danish Offshore Technology Centre · 2026-09-09

Science, research & data · Appalachia / Pennsylvania / Ohio / West Virginia

Study links spill vulnerability to produced water-like groundwater chemistry

A peer-reviewed analysis combined more than 16,000 domestic-well samples with groundwater-flow modeling and found higher odds of produced water-like chemical signatures in areas modeled as vulnerable to unconventional oil-and-gas surface spills. The association is not proof of causation, and the authors note other possible brine sources and data limitations.

Nature Sustainability · 2026-09-09

Markets & finance · United States

EIA forecasts record U.S. crude oil production in 2026

A production backdrop for water-volume questions; this is not a produced water volume series.

U.S. Energy Information Administration · 2026-09

Science, research & data · Permian Basin / West Texas

West Texas field trial finds treated produced water supported alfalfa for one season

An open-access field study found no significant differences in alfalfa growth or biomass between polished desalinated produced water and groundwater irrigation during the evaluated season; forage quality and microbial diversity were broadly comparable. Strontium in irrigation water exceeded a recommended threshold, and the authors call the result preliminary because the study covered one season, included blended irrigation, and lacked plot-level replication.

Irrigation Science · 2026-08-07

People, institutions & events · Permian Basin

Produced Water Society Permian Basin conference

Industry gathering focused on managing produced water volumes.

Produced Water Society · 2026-08

Science, research & data · Permian Basin / Texas–New Mexico

Permian modeling shows reuse cannot eliminate disposal pressure

UT Austin researcher Katie Smye estimates that Permian operations produced about 21 million barrels of water per day in 2025 and explains why recycling and treatment cannot absorb the basin-wide surplus. The episode’s volumes, recovery case and pressure estimates are research scenarios and cited datasets—not a forecast or regulatory finding—and treatment would still leave concentrate requiring disposal.

UT Austin Water Resources Podcast · 2026-07-16

Treatment, technology & reuse · United States

DOE opens funding for produced water management technologies

Federal funding puts treatment and management technology on the research agenda.

U.S. Department of Energy · 2026-07-06

Science, research & data · United States

Produced Water Management: federal fact sheet

A reference for management, treatment and reuse questions.

U.S. Department of Energy · 2026-04-16

Regulation & government · New Mexico

New Mexico HB 327: time period for produced water well decisions

Introduced in 2026 and died in committee; included as a legislative record, not an enacted rule.